Cost of Setting Up a Biodiesel Plant in India: CAPEX & OPEX Breakdown 2026
- Get link
- X
- Other Apps
India’s push toward renewable fuels and reduced crude oil imports has made biodiesel production a commercially attractive opportunity. However, one of the most common questions investors and project developers ask is: how much does it actually cost to set up a biodiesel plant in India?
This article provides a clear EPC-level breakdown of capital and operating costs, helping you make an informed investment decision.
What Determines the Cost of a Biodiesel Plant?
The cost of a biodiesel plant is not fixed. It varies depending on several technical and commercial factors:
- Plant capacity: Higher capacity plants benefit from economies of scale but require higher upfront capital.
- Feedstock selection: Used cooking oil (UCO), animal fats, and non-edible oils each have different processing requirements.
- Technology choice: Batch vs continuous process impacts both CAPEX and OPEX.
- Automation level: Manual plants cost less initially but increase long-term operating expenses.
Project scope: EPC turnkey projects cost more upfront but reduce execution risk.
Capital Cost (CAPEX) of a Biodiesel Plant in India
Capital expenditure includes all one-time costs required to make the plant operational.
Major CAPEX components include:
- Land development and civil works
- Core biodiesel processing equipment (reactors, separators, distillation)
- Utilities such as boilers, cooling systems, and power infrastructure
- Storage tanks for feedstock, biodiesel, and glycerine
- Engineering, erection, commissioning, and testing
For a commercial-scale biodiesel plant, CAPEX typically ranges from ₹3 crore to ₹15 crore, depending on capacity and configuration.
Operating Cost (OPEX) of a Biodiesel Plant
Operating costs directly affect profitability and ROI.
Key OPEX elements:
- Feedstock cost: Often 70–80% of total operating cost
- Chemicals and catalysts
- Power, steam, and water consumption
- Manpower and routine maintenance
- Waste handling and environmental compliance
Efficient process design and feedstock sourcing strategies play a crucial role in controlling OPEX.
Typical Biodiesel Plant Cost Range in India
Plant Size | Approx. CAPEX Range |
Small (5–10 TPD) | ₹3–5 crore |
Medium (20–30 TPD) | ₹6–10 crore |
Large (50+ TPD) | ₹12–15+ crore |
These are indicative figures and vary based on customization and EPC scope.
Hidden Costs Investors Often Miss
Many first-time investors underestimate:
- Utility integration costs
- Effluent treatment and compliance expenses
- Storage and logistics infrastructure
- Delays due to improper engineering planning
Choosing an experienced EPC partner significantly reduces these risks.
How to Optimize Biodiesel Plant Cost
- Select feedstock-flexible technology
- Use modular EPC design
- Optimize heat recovery and utilities
- Invest in automation where it reduces long-term OPEX
Why EPC Experience Matters
An EPC partner with proven biodiesel experience ensures:
- Higher yields
- Lower downtime
- Faster commissioning
- Regulatory compliance from day one
This directly impacts plant profitability and lifecycle cost.
Setting up a biodiesel plant in India is commercially viable—but only when capital cost, operating cost, and engineering design are aligned. A detailed techno-commercial evaluation is essential before investment.
Planning a biodiesel project?
Consult Magellanium’s EPC team for a customized cost and feasibility assessment.
MagTech offers end-to-end solutions, from feedstock studies and plant design to commissioning, automation, and ZLD compliance to ensure faster execution and lower risk.