Cost of Setting Up a Biodiesel Plant in India: CAPEX & OPEX Breakdown 2026

 


India’s push toward renewable fuels and reduced crude oil imports has made biodiesel production a commercially attractive opportunity. However, one of the most common questions investors and project developers ask is: how much does it actually cost to set up a biodiesel plant in India?

This article provides a clear EPC-level breakdown of capital and operating costs, helping you make an informed investment decision.

What Determines the Cost of a Biodiesel Plant?




The cost of a biodiesel plant is not fixed. It varies depending on several technical and commercial factors:

  • Plant capacity: Higher capacity plants benefit from economies of scale but require higher upfront capital.

     

  • Feedstock selection: Used cooking oil (UCO), animal fats, and non-edible oils each have different processing requirements.

     

  • Technology choice: Batch vs continuous process impacts both CAPEX and OPEX.

     

  • Automation level: Manual plants cost less initially but increase long-term operating expenses.

     

Project scope: EPC turnkey projects cost more upfront but reduce execution risk.

Capital Cost (CAPEX) of a Biodiesel Plant in India

Capital expenditure includes all one-time costs required to make the plant operational.

Major CAPEX components include:

  • Land development and civil works

     

  • Core biodiesel processing equipment (reactors, separators, distillation)

     

  • Utilities such as boilers, cooling systems, and power infrastructure

     

  • Storage tanks for feedstock, biodiesel, and glycerine

     

  • Engineering, erection, commissioning, and testing

     

For a commercial-scale biodiesel plant, CAPEX typically ranges from ₹3 crore to ₹15 crore, depending on capacity and configuration.

Operating Cost (OPEX) of a Biodiesel Plant

Operating costs directly affect profitability and ROI.

Key OPEX elements:

  • Feedstock cost: Often 70–80% of total operating cost

  • Chemicals and catalysts

  • Power, steam, and water consumption

  • Manpower and routine maintenance

  • Waste handling and environmental compliance

Efficient process design and feedstock sourcing strategies play a crucial role in controlling OPEX.

Typical Biodiesel Plant Cost Range in India

Plant Size

Approx. CAPEX Range

Small (5–10 TPD)

₹3–5 crore

Medium (20–30 TPD)

₹6–10 crore

Large (50+ TPD)

₹12–15+ crore

These are indicative figures and vary based on customization and EPC scope.

Hidden Costs Investors Often Miss

Many first-time investors underestimate:

  • Utility integration costs

  • Effluent treatment and compliance expenses

  • Storage and logistics infrastructure

  • Delays due to improper engineering planning

Choosing an experienced EPC partner significantly reduces these risks.

How to Optimize Biodiesel Plant Cost

  • Select feedstock-flexible technology

  • Use modular EPC design

  • Optimize heat recovery and utilities

  • Invest in automation where it reduces long-term OPEX

Why EPC Experience Matters

An EPC partner with proven biodiesel experience ensures:

  • Higher yields

  • Lower downtime

  • Faster commissioning

  • Regulatory compliance from day one

This directly impacts plant profitability and lifecycle cost.

Setting up a biodiesel plant in India is commercially viable—but only when capital cost, operating cost, and engineering design are aligned. A detailed techno-commercial evaluation is essential before investment.

Planning a biodiesel project?

Consult Magellanium’s EPC team for a customized cost and feasibility assessment.

MagTech offers end-to-end solutions, from feedstock studies and plant design to commissioning, automation, and ZLD compliance to ensure faster execution and lower risk. 